Product Details:
Payment & Shipping Terms:
|
Running Ground: | Cement Or Smooth Ground | Operation Mode: | Pandent And Remote Controller |
---|---|---|---|
Cart Frame: | Q235B | Rail Gauge: | Customized |
Color: | Customized | Working Time: | 4-5 Hours |
Wheel Type: | Polyurethane Solid Wheels | Safrty Device: | Buffer, Alarm Light, Emergency Stop Buttons |
Special Function: | Anti-Explosion, Heat-Resistant, Lifting, Dumpling | Dimension: | Customized |
Highlight: | coil transfer cart,motorised rail trolley |
Product Introduction
Our special shape support coils transfer wagon is used to transport steel coils and pipes for metal industry. This coil transfer wagon is designed to be an extremely cost effective, safe and flexible load moving alternative.
This kind of specail shape support coils transfer wagon is also called a heavy transporter, headless transporter or self-propelled modular transporter. It is specially designed for coil, pipe and other round material transportation. When the goods are loaded, we can make sure the car moves safely and the goods are in a very safe condition.
Application of specail Shape Support Coils Transfer Wagon
For horizontal load transfers of a wide range of material, we have the heavy duty, high quality handling solutions you need. The specail shape support coils transfer wagons are used: to carry loads along assembly lines; transfer material from one work station to the next; store and transport an entire shift worth of production. They can even be used as a stable yet moveable machine base. With different styles and standard capacities up to 200 tons, we have the solution you need and each style can be designed for your specific application.
Process Technology
1.CNC Cutting
The steel plate is transported from warehouse to CNC cutting workshop for cutting.
2.Preliminary Assembling
Workers put the cut steel plate together according to the design drawing.
3.Welding
Weld the steel plate with automatic welding machine after the preliminary assembling.
4.Post weld treatment
Test the welding section after the welding, polish and burring. Post weld treatment to eliminate welding stress.
5.Spray Primer
Transport the structure part after processing to painting booth for spraying primer. The main component of the primer is zinc rich epoxy antirust paint.
6.Assembling
Assemble the structure parts after spraying primer with wheels, motors and gear box, etc.
7.Paint finish
Transport the assembled cart to painting booth, inspect the integrity of primer. After that paint the finish.
8.Debugging
Debugging the cart after painting the finish with electric control system, after the debugging, the cart will be tested without load and then with load. After the inspection, the cart will be transported to storage area.
Advantages
1.It's powered by electric devices, so when you are operating it, you can't feel much noise. It causes low noise level and give workers a good working environment.
2. Our carts are easy to operate, so as soon as you get it you will be able to use it to transport your loads. 3.Running distance is unlimited.
4.Suitable for all kinds of transport occasion.
Packing & Shipping
For length is less than 6m, the width is less than 2.2m. Electric Rail Vehicle will be transported by 20ft container. If the length is longer than 5.9m and less than 12m, it will be transported by 40ft container. If the quantity is 2 sets or 3 sets, they can be transported by full container. If the quantity is 1 set, it can be transported by LCL Container.
*If the length is less than 12m, the width is beyond 2.2m. Electric Rail Vehicle needs to be transported by flat rack (20 or 40 ft) . If the equipment is beyond above dimension, and quantity need to consider bulk cargo.
Why Choose US
1.We are professional design and manufacture transfer cart company.with 15 years experience in this fields.
2.We guarantee high quality product,we do care worker's safe.
3.Our warranty is 12 months,during this period,we can maintance is for you freely,after that period,we only charge cost price.
4.Various modes including email, telephone, and online for operating guidance.
5.Flexible payment method for customers' choice.
6.Excellent engineers' team are available at the any time for customers' questions.
Contact Person: Mr. Mike Wang
Tel: 187 9067 5017
Fax: 86-0373-3020456